The first wave of CPEC energy projects was designed chiefly to reduce
Q1. The first wave of CPEC energy projects was designed chiefly to reduce
Answer: Chronic electricity shortfalls and load-shedding
Explanation: Early CPEC power plants targeted Pakistan's severe generation gap that caused long blackouts. They were not tax or trade-balance measures.